BAC Cooling Tower Parts / Black Cooling Tower Fill

Brand Name : Xcell Energy

Certification : SGS

Place of Origin : Jiangsu, China

MOQ : 1 Set

Price : Negotiated

Payment Terms : T/T

Supply Ability : 1000m2/per pay

Delivery Time : 7 Days

Packaging Details : Regular packaging/customizable

Model Number : BAC Cooling Tower Parts

Condition : New

Cooling Type : Cooling Tower Parts

Material : PVC,PP,CPVC

Warranty : 1 Year

Name : Black Cooling Tower Fill

Usage : BAC Cooling Tower

Contact Now

BAC Cooling Tower Parts / Black Tower Fill

BAC cooling tower fillers have the following features:

  • ‌High-efficiency cooling‌: Covering a large vertical surface area with a thin film promotes maximum contact between water and air, thereby improving cooling efficiency‌
  • ‌Material‌: Using flame-retardant PVC material, through vacuum forming, the thermal performance of the filler is improved by an average of 7.3%‌
  • ‌Scope of application‌: Applicable to various models of cooling towers, such as TXV, FXT, S3000, FXV, HXI, CXV and HXC series‌

Specifications:

Tech Date
Sheet Width(mm) 305/610mm
Sheet Length 1220/1830/2440mm/customized
Thickness 0.32-0.6mm/customized
Sheet Spacing 20mm
Color grey/white/black
Material PP/PVC/CPVC

BAC Cooling Tower Parts / Black Cooling Tower Fill

BAC Cooling Tower Parts / Black Cooling Tower Fill

BAC Cooling Tower Parts / Black Cooling Tower FillBAC Cooling Tower Parts / Black Cooling Tower FillBAC Cooling Tower Parts / Black Cooling Tower FillBAC Cooling Tower Parts / Black Cooling Tower Fill

Cooling Tower Fill Operating of Principle

  • Cooling towers reject heat from water-cooled systems to the atmosphere. Hot water from the system enters the cooling tower and is distributed over the fill (heat transfer surface). Air is induced or forced through the fill, causing a small portion of the water to evaporate. This evaporation removes heat from the remaining water, which is collected in the cold water basin and returned to the system to absorb more heat. Each cooling tower line, although operating under the same basic principle of operation, is arranged a little differently.
  • There are two main configurations of factory assembled cooling towers: crossflow and counterflow. In crossflow cooling towers, the water flows vertically down the fill as air flows horizontally across. In counterflow cooling towers, the water flows vertically down the fill as air flows vertically up.

Related Cooling Tower Film Fill

BAC Cooling Tower Parts / Black Cooling Tower Fill

Supply in industry

BAC Cooling Tower Parts / Black Cooling Tower Fill

How do fills work in the cooling tower?

Cooling towers reject heat from water-cooled system to the atmosphere. Hot water from the system enters the cooling tower and is distributed over the fill (heat transfer surface). Air is induced or forced through the fill, causing a small portion of the water to evaporate. This evaporation removes heat from the remaining water, which iscollected in the cold water basin and returned to the system to absorb more heat. Each cooling tower line, although operating under the same basic principle of operation, is arranged a little differently.

PACKING AND DELIVERY

BAC Cooling Tower Parts / Black Cooling Tower Fill

BAC Cooling Tower Parts / Black Cooling Tower Fill

BAC Cooling Tower Parts / Black Cooling Tower Fill

BAC Cooling Tower Parts / Black Cooling Tower Fill

BAC Cooling Tower Parts / Black Cooling Tower Fill

FAQ

Q: Are you trading company or manufacturer ?
A: We are manufacturer with our own factory.


Q: How long is your delivery time?
A: Generally it is 5-10 days if the goods are in stock. Or it is 15-20 days if the goods are not in stock, it is according to quantity.


Q: Do you provide samples ? is it free or extra ?
A: Yes, we could offer the sample for free charge. And the freight cost will on the buyer's side.


Q: What is your terms of payment ?
A: Payment<=USD1000, 100% in advance. Payment>=USD1000, 30% T/T in advance ,balance before shipment.


Product Tags:

BAC Cooling Tower Parts

      

Black Tower Fill

      

BAC Cooling Tower Fill

      
Wholesale BAC Cooling Tower Parts / Black Cooling Tower Fill from china suppliers

BAC Cooling Tower Parts / Black Cooling Tower Fill Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Xcell Energy Equipment (Suzhou) Co., Ltd.
*Subject:
*Message:
Characters Remaining: (0/3000)
 
Inquiry Cart 0